This gas cleaning unit type for desulfurization of gas can be delivered up to a length of 12 m and a diameter of 3.8 m. Depending on sulphur concetration and gas cleaning size the cleaning performance can add up to 132,000 Nm³/d.

This convenient operation gas cleaning unit can be equiped with considerable accessories.

The unit is designed for high gas volumes and optimized for regular exchange of gas cleaning mass. This is realized through automatized mass outlet and a convenient filling with upstream lock.

This unit is completely pre fabricated in our workshop and ready for operation within one to two days.

Advantages in summary

  • an operationally safe and effective system proven over decades
  • high cleaning performance with low operational costs
  • low pressure loss is achieved by optimized pellet form
  • loading of the plant with gas cleaning mass during operation
  • high loading rates and fine cleaning achieved by the very effective reaction of the cleaning medium
  • problem free and cost effective disposal of used medium

For design and structural calculation latest CAD Software will be used. Structural calculation will be carried out by an engineer through finite elements software. Our quality will be continiously monitored by certification according to EN 1090 part 1 + 2.

Design and structural analysis 1 Design and structural analysis 2

In our factory in the city of Heilbronn these gas cleaning unit types are mounted within 10 weeks. The delivery to the client is carried out by a special transport.

Fabrication 1 Fabrication 2 Fabrication 3 Fabrication 4 Fabrication 5 Fabrication 6 Fabrication 7

Tanks with length of 12 m and a diameter of 3.8 m can be bated in our bating tank. The exposure time is one to two days. After this the tanks will be prepared

Cleaning and passivation of gas cleaning unit. Passivation is carried out by high pressure water jeting.

Bating 1 Bating 2Bating 7 Bating 3 Bating 4 Bating 5 Bating 6

To guarantee operation in winter the gas cleaning unit is insulated and equipped with a heating.

Isolation and heating 1

• Preparing for transport – installation of transport frame

Transportation and Installation 1 Transportation and Installation 2 Transportation and Installation 3

 

Installation

Transportation and Installation 1 Transportation and Installation 2 Transportation and Installation 3 Transportation and Installation 4

First filling of gas cleaning unit with cleaning mass

Commissioning 1 Commissioning 2Commissioning 3